Android、Apple工程机的一些概念

市面上流通的工程机分为几种:EVT 工程机、DVT工程机、PVT工程机。不同类型工程机,稳定性、权限以及可玩性也不一样。

All Pictures are copy from Internet

PLM System :Product Lifecycle Management System

PLM可以应用于在单一地点或分散在多个地点的企业内部,以及在产品研发领域具 有协作关系的企业之间,集成与产品相关的人力资源、流程、应用系统和信息,以支持产品全生命周期的 信息创建、管理、分发和应用。

PLM是协助产品能够顺利完成在新产品开发(NPI:New Product Introduction),以及量产后的相关工程技术执行作业,大至分为五个阶段:

Planning(产品构想阶段);

EVT(工程验证与测试阶段);

DVT(设计验证与测试阶段);

PVT(生产验证与测试阶段);

MP(量产阶段)。


PLM can be applied within enterprises located at a single site or dispersed across multiple locations, as well as between companies that have collaborative relationships in the field of product development. It integrates human resources, processes, application systems, and information related to the product to support the creation, management, distribution, and application of information throughout the product lifecycle.

PLM assists products in successfully completing related engineering and technical execution tasks during new product introduction (NPI) and after mass production. It is broadly divided into five stages:

Planning (Product Concept Phase);
EVT (Engineering Verification and Testing Phase);
DVT (Design Verification and Testing Phase);
PVT (Production Verification and Testing Phase);
MP (Mass Production Phase).

7个阶段&内容&阶段目标: 参考 https://www.cnblogs.com/lsgxeva/p/16894741.html

7个阶段&内容:

  1. Charter开发:完成商业计划书、需求规格定义
  2. 产品设计&计划:定义产品方案、完成硬件和结构详细设计、完成项目计划和立项
  3. T0:软件详细设计、投板、投模、模块功能验证
  4. EVT :系统设计验证
  5. DVT :系统集成测试
  6. PVT:生产验证
  7. MP:完成生产爬坡、产品上市

7个阶段目标:

Charter开发:

  • 对产品机会的总吸引力是否符合公司的总体策略做出快速评估
  • 进行产品需求定义

产品设计&计划:

  • 清晰定义产品及竞争优势,理解业务计划,制定项目计划和资源计划,确保风险可以被合理管理
  • 优化产品需求定义,进行架构设计和可行性评估
  • 批准ID设计

T0:

  • 软件详细设计
  • 硬件模块功能参数验证
  • 投板投模

EVT:

  • 一轮或多轮EVT样机验证
  • 产品具备基本功能

DVT:

  • 整机功能验证
  • 整机制造工艺验证
  • 启动公司级别内测和大市场内测
  • 产品上市计划和服务启动

PVT:

  • 批量生产验证

MP:

  • 正式量产
  • 发布产品
  • 满足客户在性能、可靠性、成本目标等方面需求的产品

Posted

in

, ,

by

Tags:

Comments

Leave a comment